Qurayyah CCPP
Saudi Electricity Company (SEC)
Saudi Arabia
Saudi Electricity Company (SEC) implemented the Qurayyah II Combined Cycle Power Plant approximately 100 km south of Dammam. In a first phase, the project comprised 15 GE frame 7FA gas turbines, which were operated in open cycle configuration. In phase two, the project was converted to a combined cycle power plant consisting of five blocks with three gas turbines, three heat recovery boilers and one steam turbine each. In a later stage, an extension by addition of one further 3+3+1 CCPP block was carried out, resulting in the final configuration of six similar blocks.
Qurayyah CCPP
Saudi Electricity Company (SEC) implemented the Qurayyah II Combined Cycle Power Plant approximately 100 km south of Dammam. In a first phase, the project comprised 15 GE frame 7FA gas turbines, which were operated in open cycle configuration. In phase two, the project was converted to a combined cycle power plant consisting of five blocks with three gas turbines, three heat recovery boilers and one steam turbine each. In a later stage, an extension by addition of one further 3+3+1 CCPP block was carried out, resulting in the final configuration of six similar blocks.